Queue request 105 was listed in the Duke Energy interconnection queue at the end of 2025 as a 0.1 MW project in Marion County, FL, according to Berkeley Lab’s queue data file. The filing names Maricamp Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 12, 2010.

Queue ID105
Project nameNot reported
Status (as published)Operational
SubstationMaricamp Substation
Point of interconnectionMaricamp Substation
CountyMarion
StateFL
VoltageNot reported
Capacity0.1 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2010-04-12
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Maricamp Substation substation: 2 requests in the Duke Energy queue, 2 active totaling 3.1 MW.

Queue IDProjectMWResourceStatus
73Not reported3OtherOperational

Marion, FL: 6 requests in the Duke Energy queue, 4 active totaling 78.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperG2 Landfill
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2010-04-12
Operational date2010-04-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first