Substation Scout

Maricamp Substation substation interconnection queue

2 active projects totaling 3.1 MW in the Duke Energy queue.

2 Duke Energy queue filings name Maricamp Substation as the point of interconnection, all in Marion County, FL.

2active projects
3.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
73 Not reported n/r 3 Other Operational
105 Not reported n/r 0.1 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first