Marion, FL interconnection queue

4 active projects totaling 78.8 MW in the Duke Energy queue, plus 2 with terminal status (shown grayed).

4active projects
78.8active MW
6total filed
Queue IDProjectkVMWResourceStatus
232C Not reported n/r 74.9 Solar Withdrawn
269 Not reported n/r 74.9 Solar Active
255 Not reported n/r 20 Solar Withdrawn
73 Not reported n/r 3 Other Operational
100 Not reported n/r 0.8 Other Operational
105 Not reported n/r 0.1 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.