Substation Scout

Onslow, NC interconnection queue

6 active projects totaling 819.8 MW in the Duke Energy queue, plus 7 with terminal status (shown grayed).

6active projects
819.8active MW
13total filed
Queue IDProjectkVMWResourceStatus
977359 Not reported 230 199 Battery Active
977397 Not reported 230 199 Battery Active
PP00048 Not reported n/r 199 Other Active
PP00049 Not reported n/r 199 Other Active
22333 Not reported 115 185 Solar Withdrawn
20318 Not reported 230 80 Solar Withdrawn
566356 Not reported 230 80 Solar Withdrawn
957336 Not reported 230 74.9 Solar Withdrawn
15650 Not reported 230 72 Solar Withdrawn
15739 Not reported 230 72 Solar Withdrawn
44634 Not reported 230 72 Battery Withdrawn
4891 Not reported n/r 12.8 Solar Operational
18124 Not reported n/r 11 Battery Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first