Duke Energy request 18124

Duke Energy queue ID 18124

Queue request 18124 was listed in the Duke Energy interconnection queue at the end of 2025 as a 11 MW battery project in Onslow County, NC, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”.

Queue ID18124
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyOnslow
StateNC
VoltageNot reported
Capacity11 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Onslow, NC: 13 requests in the Duke Energy queue, 6 active totaling 819.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
DeveloperDuke Energy Progress, LLC
ClusterTransitional Serial Study
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Commissioning - Permission to Operate at Full Output
Queue date2017-10-26
Operational date2023-03-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.