Duke Energy request 100

Duke Energy queue ID 100

Queue request 100 was listed in the Duke Energy interconnection queue at the end of 2025 as a 0.8 MW project in Marion County, FL, according to Berkeley Lab’s queue data file. Its status as of December 31, 2025 was “Operational”, with a proposed online date of July 31, 2009.

Queue ID100
Project nameNot reported
Status (as published)Operational
SubstationNot reported
Point of interconnectionNot reported
CountyMarion
StateFL
VoltageNot reported
Capacity0.8 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2009-07-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Marion, FL: 6 requests in the Duke Energy queue, 4 active totaling 78.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperG2 Landfill
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2009-04-15
Operational date2009-01-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.