Substation Scout

Levy, FL interconnection queue

6 active projects totaling 443.3 MW in the Duke Energy queue, plus 19 with terminal status (shown grayed).

6active projects
443.3active MW
25total filed
Queue IDProjectkVMWResourceStatus
118 Not reported n/r 1,211 Other Withdrawn
119 Not reported n/r 1,211 Other Withdrawn
104 Not reported n/r 1,150 Nuclear Withdrawn
32 Not reported n/r 1,150 Nuclear Withdrawn
46 Not reported n/r 1,150 Nuclear Withdrawn
82 Not reported n/r 418 Gas Withdrawn
87 Not reported n/r 418 Gas Withdrawn
78 Not reported n/r 223 Gas Withdrawn
79 Not reported n/r 223 Gas Withdrawn
80 Not reported n/r 223 Gas Withdrawn
81 Not reported n/r 223 Gas Withdrawn
83 Not reported n/r 223 Gas Withdrawn
84 Not reported n/r 223 Gas Withdrawn
85 Not reported n/r 223 Gas Withdrawn
86 Not reported n/r 223 Gas Withdrawn
202.1 Not reported n/r 74.9 Solar Active
205 Not reported n/r 74.9 Solar Withdrawn
240 Not reported n/r 74.9 Solar Operational
313 Not reported n/r 74.9 Solar Withdrawn
173 Not reported n/r 74.5 Solar Operational
225 Not reported n/r 74.5 Solar Withdrawn
314 Not reported n/r 74.5 Solar Suspended
315 Not reported n/r 74.5 Solar Suspended
FC100001 Not reported 230 74.5 Solar Withdrawn
193 Not reported n/r 70 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first