Substation Scout

Duke Energy request 193

Duke Energy queue ID 193

Queue request 193 was listed in the Duke Energy interconnection queue at the end of 2025 as a 70 MW solar project in Levy County, FL, according to Berkeley Lab’s queue data file. The filing names Bronson-Chiefland as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of November 30, 2021.

Queue ID193
Project nameNot reported
Status (as published)Active
SubstationBronson-Chiefland
Point of interconnectionBronson-Chiefland
CountyLevy
StateFL
VoltageNot reported
Capacity70 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2021-11-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Levy, FL: 25 requests in the Duke Energy queue, 6 active totaling 443.3 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperOrigis Development LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Queue date2017-08-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first