Duke Energy request 315

Duke Energy queue ID 315

Queue request 315 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.5 MW solar project in Levy County, FL, according to Berkeley Lab’s queue data file. The filing names Sunset Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of December 31, 2026.

Queue ID315
Project nameNot reported
Status (as published)Suspended
SubstationSunset Switching Station
Point of interconnectionSunset Switching Station
CountyLevy
StateFL
VoltageNot reported
Capacity74.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-12-31
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sunset Switching Station substation: 2 requests in the Duke Energy queue, 2 active totaling 149 MW.

Queue IDProjectMWResourceStatus
314Not reported74.5SolarSuspended

Levy, FL: 25 requests in the Duke Energy queue, 6 active totaling 443.3 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperFlorida Renewable Partners, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Queue date2022-08-17

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first