Lee, SC interconnection queue
4 active projects totaling 410 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).
4active projects
410active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 962925 | Not reported | 230 | 145 | Solar | Active |
| PP00034 | Not reported | n/r | 145 | Other | Active |
| 8277 | Not reported | 230 | 100 | Solar | Withdrawn |
| 17236 | Not reported | 230 | 75 | Solar | Withdrawn |
| 569814 | Not reported | 230 | 74.9 | Solar | Withdrawn |
| 962757 | Not reported | 230 | 70 | Solar | Withdrawn |
| 566580 | Not reported | 230 | 60 | Solar | Active |
| PP00010 | Not reported | n/r | 60 | Solar | Active |
| 25592 | Not reported | 230 | 2 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.