Lee, SC interconnection queue

4 active projects totaling 410 MW in the Duke Energy queue, plus 5 with terminal status (shown grayed).

4active projects
410active MW
9total filed
Queue IDProjectkVMWResourceStatus
962925 Not reported 230 145 Solar Active
PP00034 Not reported n/r 145 Other Active
8277 Not reported 230 100 Solar Withdrawn
17236 Not reported 230 75 Solar Withdrawn
569814 Not reported 230 74.9 Solar Withdrawn
962757 Not reported 230 70 Solar Withdrawn
566580 Not reported 230 60 Solar Active
PP00010 Not reported n/r 60 Solar Active
25592 Not reported 230 2 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.