Duke Energy request PP00010
Duke Energy queue ID PP00010
Queue request PP00010 was listed in the Duke Energy interconnection queue at the end of 2025 as a 60 MW solar project in Lee County, SC, according to Berkeley Lab’s queue data file. The filing names ROBINSON PLANT - SUMTER as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 29, 2028.
| Queue ID | PP00010 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | ROBINSON PLANT - SUMTER |
| Point of interconnection | ROBINSON PLANT - SUMTER |
| County | Lee |
| State | SC |
| Voltage | Not reported |
| Capacity | 60 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-12-29 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
ROBINSON PLANT - SUMTER substation: 3 requests in the Duke Energy queue, 2 active totaling 120 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| 566580 | Not reported | 60 | Solar | Active |
| 569814 | Not reported | 74.9 | Solar | Withdrawn |
Lee, SC: 9 requests in the Duke Energy queue, 4 active totaling 410 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Provisional Construction in Progress |
| Queue date | 2025-01-13 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.