Duke Energy request PP00010

Duke Energy queue ID PP00010

Queue request PP00010 was listed in the Duke Energy interconnection queue at the end of 2025 as a 60 MW solar project in Lee County, SC, according to Berkeley Lab’s queue data file. The filing names ROBINSON PLANT - SUMTER as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 29, 2028.

Queue IDPP00010
Project nameNot reported
Status (as published)Active
SubstationROBINSON PLANT - SUMTER
Point of interconnectionROBINSON PLANT - SUMTER
CountyLee
StateSC
VoltageNot reported
Capacity60 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2028-12-29
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

ROBINSON PLANT - SUMTER substation: 3 requests in the Duke Energy queue, 2 active totaling 120 MW.

Queue IDProjectMWResourceStatus
566580Not reported60SolarActive
569814Not reported74.9SolarWithdrawn

Lee, SC: 9 requests in the Duke Energy queue, 4 active totaling 410 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Provisional Construction in Progress
Queue date2025-01-13

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner