Duke Energy request 962925

Duke Energy queue ID 962925

Queue request 962925 was listed in the Duke Energy interconnection queue at the end of 2025 as a 145 MW solar project in Lee County, SC, according to Berkeley Lab’s queue data file. The filing names Robinson Plant - Sumter as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID962925
Project nameNot reported
Status (as published)Active
SubstationRobinson Plant - Sumter
Point of interconnectionRobinson Plant - Sumter 230kV
CountyLee
StateSC
Voltage230 kV
Capacity145 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lee, SC: 9 requests in the Duke Energy queue, 4 active totaling 410 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Cluster2024 Solar + Procurement
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 2 Cluster Study - In Progress
Queue date2024-09-26

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.