Substation Scout

Highlands, FL interconnection queue

4 active projects totaling 294.8 MW in the Duke Energy queue, plus 9 with terminal status (shown grayed).

4active projects
294.8active MW
13total filed
Queue IDProjectkVMWResourceStatus
FC100008 Not reported 69 100 Battery Active
138C Not reported n/r 74.9 Solar Withdrawn
175 Not reported n/r 74.9 Solar Withdrawn
177 Not reported n/r 74.9 Solar Withdrawn
256 Not reported n/r 74.9 Solar Withdrawn
257 Not reported n/r 74.9 Solar Withdrawn
258 Not reported n/r 74.9 Solar Active
259 Not reported n/r 74.9 Solar Active
304 Not reported n/r 74.9 Solar Withdrawn
304A Not reported n/r 74.9 Solar Withdrawn
FC100005 Not reported 230 74.9 Solar Withdrawn
316 Not reported n/r 74.5 Solar Withdrawn
149 Not reported n/r 45 Solar Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.