9 active projects totaling 658 MW in the Duke Energy queue, plus 14 with terminal status (shown grayed).

9active projects
658active MW
23total filed
Queue IDProjectkVMWResourceStatus
90 Not reported n/r 868 Gas Withdrawn
88 Not reported n/r 546 Gas Withdrawn
160 Not reported n/r 74.9 Solar Operational
218C Not reported n/r 74.9 Solar Withdrawn
262 Not reported n/r 74.9 Solar Withdrawn
294 Not reported 69 74.9 Solar Withdrawn
295 Not reported 69 74.9 Solar Operational
300 Not reported n/r 74.9 Solar Withdrawn
154 Not reported n/r 74.5 Solar Operational
171 Not reported n/r 74.5 Solar Active
174 Not reported n/r 74.5 Solar Operational
283 Not reported n/r 74.5 Solar Suspended
286 Not reported n/r 74.5 Solar Active
324 Not reported n/r 74.5 Solar Suspended
336 Not reported n/r 61.2 Solar Suspended
189A Not reported n/r 40 Solar Withdrawn
194A Not reported n/r 40 Solar Withdrawn
246 Not reported n/r 40 Solar Withdrawn
172 Not reported n/r 34 Solar Withdrawn
136 Not reported n/r 30 Solar Withdrawn
155B Not reported n/r 30 Solar Withdrawn
189B Not reported n/r 30 Solar Withdrawn
190B Not reported n/r 30 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first