Gilchrist, FL interconnection queue
9 active projects totaling 658 MW in the Duke Energy queue, plus 14 with terminal status (shown grayed).
9active projects
658active MW
23total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 90 | Not reported | n/r | 868 | Gas | Withdrawn |
| 88 | Not reported | n/r | 546 | Gas | Withdrawn |
| 160 | Not reported | n/r | 74.9 | Solar | Operational |
| 218C | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 262 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 294 | Not reported | 69 | 74.9 | Solar | Withdrawn |
| 295 | Not reported | 69 | 74.9 | Solar | Operational |
| 300 | Not reported | n/r | 74.9 | Solar | Withdrawn |
| 154 | Not reported | n/r | 74.5 | Solar | Operational |
| 171 | Not reported | n/r | 74.5 | Solar | Active |
| 174 | Not reported | n/r | 74.5 | Solar | Operational |
| 283 | Not reported | n/r | 74.5 | Solar | Suspended |
| 286 | Not reported | n/r | 74.5 | Solar | Active |
| 324 | Not reported | n/r | 74.5 | Solar | Suspended |
| 336 | Not reported | n/r | 61.2 | Solar | Suspended |
| 189A | Not reported | n/r | 40 | Solar | Withdrawn |
| 194A | Not reported | n/r | 40 | Solar | Withdrawn |
| 246 | Not reported | n/r | 40 | Solar | Withdrawn |
| 172 | Not reported | n/r | 34 | Solar | Withdrawn |
| 136 | Not reported | n/r | 30 | Solar | Withdrawn |
| 155B | Not reported | n/r | 30 | Solar | Withdrawn |
| 189B | Not reported | n/r | 30 | Solar | Withdrawn |
| 190B | Not reported | n/r | 30 | Solar | Withdrawn |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.
Site Scanner