Substation Scout

Duke Energy request 324

Duke Energy queue ID 324

Queue request 324 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.5 MW solar project in Gilchrist County, FL, according to Berkeley Lab’s queue data file. The filing names Hayfield Substation as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of December 1, 2027.

Queue ID324
Project nameNot reported
Status (as published)Suspended
SubstationHayfield Substation
Point of interconnectionHayfield Substation
CountyGilchrist
StateFL
VoltageNot reported
Capacity74.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Hayfield Substation substation: 4 requests in the Duke Energy queue, 4 active totaling 298 MW.

Queue IDProjectMWResourceStatus
154Not reported74.5SolarOperational
171Not reported74.5SolarActive
286Not reported74.5SolarActive

Gilchrist, FL: 23 requests in the Duke Energy queue, 9 active totaling 658 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperFlorida Renewable Partners, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Queue date2023-02-20

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.