Duke Energy request 336
Duke Energy queue ID 336
Queue request 336 was listed in the Duke Energy interconnection queue at the end of 2025 as a 61.2 MW solar project in Gilchrist County, FL, according to Berkeley Lab’s queue data file. The filing names Bell Tap as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of June 1, 2028.
| Queue ID | 336 |
|---|---|
| Project name | Not reported |
| Status (as published) | Suspended |
| Substation | Bell Tap |
| Point of interconnection | Bell Tap |
| County | Gilchrist |
| State | FL |
| Voltage | Not reported |
| Capacity | 61.2 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2028-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Gilchrist, FL: 23 requests in the Duke Energy queue, 9 active totaling 658 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Florida |
|---|---|
| Developer | Seminole Electric Cooperative, Inc |
| Interconnection service | NRIS |
| Project type | Generation |
| Queue date | 2023-09-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.