Duplin, NC interconnection queue

4 active projects totaling 304.8 MW in the Duke Energy queue, plus 8 with terminal status (shown grayed).

4active projects
304.8active MW
12total filed
Queue IDProjectkVMWResourceStatus
177046 Not reported 230 275 Solar Withdrawn
569238 Not reported 230 111.6 Solar Withdrawn
568978 Not reported 230 80 Solar Withdrawn
569144 Not reported 230 80 Solar Withdrawn
917677 Not reported n/r 80 Solar Withdrawn
962971 Not reported n/r 80 Solar Active
PP00044 Not reported n/r 80 Other Active
PP00051 Not reported n/r 80 Other Active
153790 Not reported 115 72 Solar Withdrawn
4910 Not reported 230 64.8 Solar Operational
920715 Not reported 115 49.9 Solar Withdrawn
963103 Not reported n/r 49.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first