Duke Energy request PP00044
Duke Energy queue ID PP00044
Queue request PP00044 was listed in the Duke Energy interconnection queue at the end of 2025 as a 80 MW project in Duplin County, NC, according to Berkeley Lab’s queue data file. The filing names Clinton - Mt Olive 115 as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 13, 2029.
| Queue ID | PP00044 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Clinton - Mt Olive 115 |
| Point of interconnection | Clinton - Mt Olive 115 |
| County | Duplin |
| State | NC |
| Voltage | Not reported |
| Capacity | 80 MW |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Proposed online date | 2029-12-13 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Duplin, NC: 12 requests in the Duke Energy queue, 4 active totaling 304.8 MW.
Tracked changes
Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Duke Energy Progress |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | In Progress (unknown study) |
| Study phase (as the queue printed it) | Provisional Interconnection Request Validation |
| Queue date | 2025-08-22 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.