Duke Energy queue ID PP00051

Queue request PP00051 was listed in the Duke Energy interconnection queue at the end of 2025 as a 80 MW project in Duplin County, NC, according to Berkeley Lab’s queue data file. The filing names Tri-County EMC Mt Olive POD 115 Tap Line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 28, 2029.

Queue IDPP00051
Project nameNot reported
Status (as published)Active
SubstationTri-County EMC Mt Olive POD 115 Tap Line
Point of interconnectionTri-County EMC Mt Olive POD 115 Tap Line
CountyDuplin
StateNC
VoltageNot reported
Capacity80 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2029-02-28
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Duplin, NC: 12 requests in the Duke Energy queue, 4 active totaling 304.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Progress
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Provisional Study in Progress
Queue date2025-08-19

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.