Substation Scout

Columbia, FL interconnection queue

4 active projects totaling 298.8 MW in the Duke Energy queue, plus 3 with terminal status (shown grayed).

4active projects
298.8active MW
7total filed
Queue IDProjectkVMWResourceStatus
148 Not reported n/r 74.9 Solar Operational
152 Not reported n/r 74.9 Solar Operational
153 Not reported n/r 74.9 Solar Withdrawn
202A Not reported n/r 74.9 Solar Withdrawn
151 Not reported n/r 74.5 Solar Active
169 Not reported n/r 74.5 Solar Operational
170 Not reported n/r 74.5 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.