Substation Scout

Duke Energy request 169

Duke Energy queue ID 169

Queue request 169 was listed in the Duke Energy interconnection queue at the end of 2025 as a 74.5 MW solar project in Columbia County, FL, according to Berkeley Lab’s queue data file. The filing names Radiant Switching Station as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of November 27, 2024.

Queue ID169
Project nameNot reported
Status (as published)Operational
SubstationRadiant Switching Station
Point of interconnectionRadiant Switching Station
CountyColumbia
StateFL
VoltageNot reported
Capacity74.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2024-11-27
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Radiant Switching Station substation: 4 requests in the Duke Energy queue, 3 active totaling 223.9 MW.

Queue IDProjectMWResourceStatus
152Not reported74.9SolarOperational
151Not reported74.5SolarActive
153Not reported74.9SolarWithdrawn

Columbia, FL: 7 requests in the Duke Energy queue, 4 active totaling 298.8 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Florida
DeveloperFRP Columbia County Solar, LLC
Interconnection serviceNRIS/ERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Queue date2016-12-21
Operational date2024-04-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first