Anderson, SC interconnection queue

9 active projects totaling 1,591.9 MW in the Duke Energy queue, plus 11 with terminal status (shown grayed).

9active projects
1,591.9active MW
20total filed
Queue IDProjectkVMWResourceStatus
957264 Not reported 230 1,450 Gas Active
20197 Not reported n/r 747 Gas Withdrawn
220662 Not reported 100 75 Solar Withdrawn
569088 Not reported 100 75 Solar Withdrawn
920747 Not reported 100 75 Solar Withdrawn
224644 Not reported n/r 74.9 Solar Withdrawn
566202 Not reported 100 74.9 Solar Active
914241 Not reported n/r 74.9 Solar Withdrawn
125782 Not reported 100 50 Solar Withdrawn
919799 Not reported n/r 45 Solar Withdrawn
963118 Not reported 100 35 Solar Withdrawn
962989 Not reported 100 34 Solar Withdrawn
956475 Not reported 100 30 Gas Active
978030 Not reported 100 20 Gas Active
957514 Not reported n/r 5 Gas Active
957517 Not reported n/r 5 Gas Active
968482 Not reported n/r 3 Solar Active
972410 Not reported n/r 2.5 Solar Active
977127 Not reported n/r 1.5 Solar Active
949286 Not reported n/r 0.9 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with Duke Energy before relying on these figures.