Duke Energy request 972410

Duke Energy queue ID 972410

Queue request 972410 was listed in the Duke Energy interconnection queue at the end of 2025 as a 2.5 MW solar project in Anderson County, SC, according to Berkeley Lab’s queue data file. The filing names DOCHENO RET as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID972410
Project nameNot reported
Status (as published)Active
SubstationDOCHENO RET
Point of interconnectionDOCHENO RET
CountyAnderson
StateSC
VoltageNot reported
Capacity2.5 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

DOCHENO RET substation: 2 requests in the Duke Energy queue, 2 active totaling 4 MW.

Queue IDProjectMWResourceStatus
977127Not reported1.5SolarActive

Anderson, SC: 20 requests in the Duke Energy queue, 9 active totaling 1,591.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2025 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-03-18

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.