Substation Scout

Duke Energy request 968482

Duke Energy queue ID 968482

Queue request 968482 was listed in the Duke Energy interconnection queue at the end of 2025 as a 3 MW solar project in Anderson County, SC, according to Berkeley Lab’s queue data file. The filing names SANDY SPRINGS RET as its point of interconnection. Its status as of December 31, 2025 was “Active”.

Queue ID968482
Project nameNot reported
Status (as published)Active
SubstationSANDY SPRINGS RET
Point of interconnectionSANDY SPRINGS RET
CountyAnderson
StateSC
VoltageNot reported
Capacity3 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Anderson, SC: 20 requests in the Duke Energy queue, 9 active totaling 1,591.9 MW.

Tracked changes

Not tracked. Duke Energy rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityDuke Energy Carolinas
Cluster2025 DISIS
Interconnection serviceOther
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study - Study Complete
Queue date2025-01-03

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first