TBD substation interconnection queue
5 active projects totalling 1,480 MW in the BPA queue, plus 14 with terminal status (shown greyed).
5active projects
1,480active MW
19total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G0953 | Not reported | n/r | 600 | Wind | STUDY |
| G0549 | Not reported | n/r | 400 | Solar | WITHDRAWN |
| G0956 | Not reported | n/r | 400 | Wind | STUDY |
| G0954 | Not reported | n/r | 350 | Wind | WITHDRAWN |
| G0955 | Not reported | n/r | 350 | Wind | STUDY |
| G0427 | Not reported | n/r | 300 | Wind | WITHDRAWN |
| G0761 | Not reported | n/r | 290 | Wind | WITHDRAWN |
| G0740 | Not reported | n/r | 200 | Solar | WITHDRAWN |
| G0868 | Not reported | n/r | 200 | Solar | WITHDRAWN |
| G0604 | Not reported | n/r | 115 | Solar | WITHDRAWN |
| G0867 | Not reported | n/r | 100 | Wind | STUDY |
| G1011 | Not reported | n/r | 100 | Solar | WITHDRAWN |
| G0557 | Not reported | n/r | 80 | Solar | WITHDRAWN |
| G0719 | Not reported | n/r | 80 | Solar | WITHDRAWN |
| G0364 | Not reported | n/r | 50 | Other | WITHDRAWN |
| G0627 | Not reported | n/r | 45 | Solar | WITHDRAWN |
| G0592 | Not reported | n/r | 40 | Solar | WITHDRAWN |
| G0733 | Not reported | n/r | 30 | Battery | STUDY |
| G0772 | Not reported | n/r | 25 | Gas | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.