Substation Scout

Wheatland, MT interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0353 Not reported n/r 200 Wind WITHDRAWN
G0354 Not reported n/r 200 Wind WITHDRAWN
G0355 Not reported n/r 200 Wind WITHDRAWN
G0356 Not reported n/r 200 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.