Whatcom, WA interconnection queue
0 active projects totalling 0 MW in the BPA queue, plus 6 with terminal status (shown greyed).
0active projects
0active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| G34 | Competitive Power Venture | 500 | 1,300 | Gas | WITHDRAWN |
| G27-01 | Cherry Point Refinery | n/r | 1,000 | Gas | WITHDRAWN |
| G24 | 500MW Custer-[Intalco,Portal Way] 1 | 230 | 500 | Gas | WITHDRAWN |
| G25 | 500MW Custer-[Intalco,Portal Way] 2 | 230 | 500 | Gas | WITHDRAWN |
| G64 | US Elect Power Corp | 230 | 349 | Gas | WITHDRAWN |
| G86 | Eureka Flats Wind Farm | 500 | 150 | Wind | WITHDRAWN |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.