Whatcom, WA interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
G34 Competitive Power Venture 500 1,300 Gas WITHDRAWN
G27-01 Cherry Point Refinery n/r 1,000 Gas WITHDRAWN
G24 500MW Custer-[Intalco,Portal Way] 1 230 500 Gas WITHDRAWN
G25 500MW Custer-[Intalco,Portal Way] 2 230 500 Gas WITHDRAWN
G64 US Elect Power Corp 230 349 Gas WITHDRAWN
G86 Eureka Flats Wind Farm 500 150 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.