Substation Scout

Union, OR interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 6 with terminal status (shown greyed).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatus
G0293 Not reported 230 200 Wind WITHDRAWN
G0305 Not reported 230 200 Wind WITHDRAWN
G0206 Not reported n/r 110 Wind WITHDRAWN
G0646 Not reported 69 50 Solar WITHDRAWN
G0764 Not reported 230 5 Solar WITHDRAWN
G0458 Not reported n/r 2 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.