Substation Scout

Pend Oreille, WA interconnection queue

1 active project totalling 70 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
70active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0496 Not reported 230 70 Hydro WITHDRAWN
G0507 Boundary Powerhouse 230 70 Hydro ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.