Substation Scout

Modoc, CA interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G71 AES Pacific Inc 230 300 Other WITHDRAWN
G0868 Not reported n/r 200 Solar WITHDRAWN
G0547 Not reported 69 80 Solar WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.