Substation Scout

Linn or Lane, OR interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0900 Not reported 230 200 Solar WITHDRAWN
G0901 Not reported 230 200 Solar WITHDRAWN
G0902 Not reported 115 200 Other WITHDRAWN
G0885 Not reported 115 80 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.