Lincoln, WA interconnection queue

4 active projects totalling 1,500 MW in the BPA queue, plus 4 with terminal status (shown greyed).

4active projects
1,500active MW
8total filed
Queue IDProjectkVMWResourceStatus
G0953 Not reported n/r 600 Wind STUDY
G0956 Not reported n/r 400 Wind STUDY
G0954 Not reported n/r 350 Wind WITHDRAWN
G0955 Not reported n/r 350 Wind STUDY
G0860 Not reported 230 300 Wind WITHDRAWN
G0997 Not reported 115 300 Wind WITHDRAWN
G0985 Not reported 115 150 Solar STUDY
G0210 Not reported 115 75 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.