Substation Scout

Lincoln, OR interconnection queue

1 active project totalling 20 MW in the BPA queue.

1active projects
20active MW
1total filed
Queue IDProjectkVMWResourceStatus
G0505 Not reported 12.5 20 Hydro CONST AGRMT EXE

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.