Substation Scout

Lincoln, MT interconnection queue

1 active project totalling 646 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
646active MW
2total filed
Queue IDProjectkVMWResourceStatus
G0566 Libby Dam n/r 646 Hydro ENERGIZED
G0317 Libby 6th Unit n/r 120 Hydro WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.