Substation Scout

Klickitat, OR interconnection queue

1 active project totalling 100 MW in the BPA queue, plus 3 with terminal status (shown greyed).

1active projects
100active MW
4total filed
Queue IDProjectkVMWResourceStatus
G0610 Not reported 500 450 Solar WITHDRAWN
G112 Iberdrola Renewables Inc 500 200 Wind WITHDRAWN
G67 100MW Midway-Bonneville 230 100 Wind WITHDRAWN
G98-02 White Creek 230 100 Wind ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.