Substation Scout

Grant, OR interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
G29 BP Energy Company n/r 200 Wind WITHDRAWN
G0601 Not reported 115 14 Solar WITHDRAWN
G0423 Not reported 115 10 Wind WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.