Substation Scout

Gilliam & Morrow, OR interconnection queue

1 active project totalling 204 MW in the BPA queue.

1active projects
204active MW
1total filed
Queue IDProjectkVMWResourceStatus
G0362 Wheatridge East Substation 500 204 Wind ENERGIZED

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.