Substation Scout

Fremont, ID interconnection queue

1 active project totalling 95 MW in the BPA queue, plus 1 with terminal status (shown greyed).

1active projects
95active MW
2total filed
Queue IDProjectkVMWResourceStatus
G1033 Not reported 115 170 Solar WITHDRAWN
G0945 Not reported 161 95 Solar STUDY

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.