Substation Scout

Cowlitz, WA interconnection queue

2 active projects totalling 420 MW in the BPA queue, plus 14 with terminal status (shown greyed).

2active projects
420active MW
16total filed
Queue IDProjectkVMWResourceStatus
G0757 Not reported 500 1,650 Solar WITHDRAWN
G0213 Not reported 230 600 Gas WITHDRAWN
G3 Enron Power Marketing 230 600 Gas WITHDRAWN
G1021 Not reported n/r 500 Wind WITHDRAWN
G1022 Not reported n/r 500 Wind WITHDRAWN
G0258 Not reported n/r 320 Gas WITHDRAWN
G4 Mint Farm Energy Center 230 320 Gas ENERGIZED
G65 310MW Cardwell n/r 310 Gas WITHDRAWN
G0922 Not reported 230 100 Battery STUDY
G37 Nordic Energy Barge 1 n/r 100 Gas WITHDRAWN
G44 100MW Longview 1 n/r 100 Gas WITHDRAWN
G45 100MW Longview 2 n/r 100 Gas WITHDRAWN
G46-02 100MW Cowlitz PUD BHP at Kalama 115 100 Gas WITHDRAWN
G46-03 100MW Cowlitz-Cardwell 115 100 Gas WITHDRAWN
G0444 Not reported n/r 35 Other WITHDRAWN
G0976 Not reported 115 9 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.