Clatsop, OR interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
G128 Summit/Westward 230 536 Gas WITHDRAWN
G19-01 Summit PNW 230 520 Gas WITHDRAWN
G0653 Not reported 230 117 Wind WITHDRAWN
G68 Clatskanie n/r 65 Gas WITHDRAWN
G0415 Not reported 115 20 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.