Substation Scout

Cassia, ID interconnection queue

0 active projects totalling 0 MW in the BPA queue, plus 17 with terminal status (shown greyed).

0active projects
0active MW
17total filed
Queue IDProjectkVMWResourceStatus
G115 Windland Inc 138 200 Wind WITHDRAWN
G0497 Not reported n/r 38 Other WITHDRAWN
G0493 Not reported n/r 30 Other WITHDRAWN
G125 USGeothermal 34.5 30 Other WITHDRAWN
G0245 Not reported n/r 20 Wind WITHDRAWN
G0246 Not reported n/r 20 Wind WITHDRAWN
G0247 Not reported n/r 20 Wind WITHDRAWN
G0248 Not reported n/r 20 Wind WITHDRAWN
G0388 Not reported n/r 20 Wind WITHDRAWN
G0395 Not reported 138 20 Wind WITHDRAWN
G0411 Not reported 138 20 Wind WITHDRAWN
G0412 Not reported 138 20 Wind WITHDRAWN
G0442 Not reported 13.8 20 Wind WITHDRAWN
G0443 Not reported 13.8 20 Wind WITHDRAWN
G0445 Not reported n/r 20 Wind WITHDRAWN
G0448 Not reported n/r 20 Wind WITHDRAWN
G0821 Not reported 138 10 Other WITHDRAWN

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with BPA before relying on these figures.