Three Rivers substation interconnection queue

1 active project totaling 125 MW in the APS queue, plus 1 with terminal status (shown grayed).

2 APS queue filings name Three Rivers as the point of interconnection, all in Maricopa County, AZ.

1active projects
125active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q542 Not reported 230 400 Battery Withdrawn
Q614 Not reported 230 125 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.