Substation Scout

APS request Q614

APS queue ID Q614

Queue request Q614 was listed in the APS interconnection queue at the end of 2025 as a 125 MW project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Three Rivers as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 30, 2027.

Queue IDQ614
Project nameNot reported
Status (as published)Active
SubstationThree Rivers
Point of interconnectionThree Rivers 230kV
CountyMaricopa
StateAZ
Voltage230 kV
Capacity125 MW
Resource (as published)Other
Resource categoryOther (normalized for filtering)
Proposed online date2027-04-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Three Rivers substation: 2 requests in the APS queue, 1 active totaling 125 MW.

Queue IDProjectMWResourceStatus
Q542Not reported400BatteryWithdrawn

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Phase 1 Cluster Study
Queue date2025-05-21

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first