Redhawk Switchyard substation interconnection queue

2 active projects totaling 393 MW in the APS queue.

2 APS queue filings name Redhawk Switchyard as the point of interconnection, all in Maricopa County, AZ.

2active projects
393active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q519 Not reported 500 350 Gas Active
Q550 Not reported 500 43 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.