Queue request Q519 was listed in the APS interconnection queue at the end of 2025 as a 350 MW gas project in Maricopa County, AZ, according to Berkeley Lab’s queue data file. The filing names Redhawk Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2028.

Queue IDQ519
Project nameNot reported
Status (as published)Active
SubstationRedhawk Switchyard
Point of interconnectionRedhawk 500 kV Switchyard
CountyMaricopa
StateAZ
Voltage500 kV
Capacity350 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2028-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Redhawk Switchyard substation: 2 requests in the APS queue, 2 active totaling 393 MW.

Queue IDProjectMWResourceStatus
Q550Not reported43OtherActive

Maricopa, AZ: 259 requests in the APS queue, 82 active totaling 24,048 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Facility Study
Study phase (as the queue printed it)Transitional Cluster: Phase 4 Facilities Study
Queue date2023-03-31

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.