APS request Q572
APS queue ID Q572
Queue request Q572 was listed in the APS interconnection queue at the end of 2025 as a 1,300 MW project in Riverside County, CA, according to Berkeley Lab’s queue data file. The filing names Delaney Switchyard/TS30 Switchyard as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of May 9, 2031.
| Queue ID | Q572 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Delaney Switchyard/TS30 Switchyard |
| Point of interconnection | Delaney 500kV Switchyard/TS30 500kV Switchyard |
| County | Riverside |
| State | CA |
| Voltage | 500 kV |
| Capacity | 1,300 MW |
| Resource (as published) | Other |
| Resource category | Other (normalized for filtering) |
| Proposed online date | 2031-05-09 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Riverside, CA: 2 requests in the APS queue, 1 active totaling 1,300 MW.
Tracked changes
Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Arizona Public Service |
|---|---|
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Study phase (as the queue printed it) | Phase 1 Cluster Study |
| Queue date | 2024-05-15 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.