Substation Scout

Riverside, CA interconnection queue

1 active project totaling 1,300 MW in the APS queue, plus 1 with terminal status (shown grayed).

1active projects
1,300active MW
2total filed
Queue IDProjectkVMWResourceStatus
Q499 Not reported 500 1,300 Hydro Withdrawn
Q572 Not reported 500 1,300 Other Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with APS before relying on these figures.