Substation Scout

APS request Q339

APS queue ID Q339

Queue request Q339 was listed in the APS interconnection queue at the end of 2025 as a 53 MW hybrid project in Yavapai County, AZ, according to Berkeley Lab’s queue data file. The filing names Old Home Manor Substation as its point of interconnection. Its status as of December 31, 2025 was “Suspended”, with a proposed online date of March 15, 2022.

Queue IDQ339
Project nameNot reported
Status (as published)Suspended
SubstationOld Home Manor Substation
Point of interconnectionOld Home Manor 69kV Substation
CountyYavapai
StateAZ
Voltage69 kV
Capacity53 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2022-03-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Yavapai, AZ: 28 requests in the APS queue, 5 active totaling 636 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Suspended
Study phase (as the queue printed it)Customer Initiated Suspension
Queue date2020-03-30
Components (hybrid)Solar 53 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first