Substation Scout

APS request Q162

APS queue ID Q162

Queue request Q162 was listed in the APS interconnection queue at the end of 2025 as a 19 MW solar project in Yavapai County, AZ, according to Berkeley Lab’s queue data file. The filing names Granite Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of October 15, 2012.

Queue IDQ162
Project nameNot reported
Status (as published)Operational
SubstationGranite Creek Substation
Point of interconnectionGranite Creek Substation
CountyYavapai
StateAZ
VoltageNot reported
Capacity19 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2012-10-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Granite Creek Substation substation: 2 requests in the APS queue, 2 active totaling 38 MW.

Queue IDProjectMWResourceStatus
Q395Not reported19BatteryOperational

Yavapai, AZ: 28 requests in the APS queue, 5 active totaling 636 MW.

Tracked changes

Not tracked. APS rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityArizona Public Service
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)In-Service
Queue date2010-08-06

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.