Queue request 628 was listed in the TVA interconnection queue at the end of 2025 as a 1,600 MW gas project in Todd County, KY, according to Berkeley Lab’s queue data file. The filing names PARADISE - MONTGOMERY as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2030.
| Queue ID | 628 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | PARADISE - MONTGOMERY |
| Point of interconnection | PARADISE - MONTGOMERY 500 KV |
| County | Todd |
| State | KY |
| Voltage | 500 kV |
| Capacity | 1,600 MW |
| Resource (as published) | Gas |
| Resource category | Gas (normalized for filtering) |
| Proposed online date | 2030-06-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Todd, KY: 3 requests in the TVA queue, 1 active totaling 1,600 MW.
Tracked changes
Not tracked. TVA rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Tennessee Valley Authority |
|---|---|
| Cluster | TC25-028 |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Cluster Study |
| Queue date | 2024-06-12 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.